Market reference: terms and conditions
Limitation of liability: buyer demands and supplier position
Aggregate liability cap as a share of the contract price in 4 published sales conditions.
Range
| Metric | Range | Sets of terms |
|---|---|---|
| Aggregate liability cap, share of contract price | 10% to 100% | 4 sets of terms (supplier side) |
Buyer side: fewer than three sets of terms with quantified values; individual values after sign-in.
Basis: contract price or price of the part giving rise to the claim.
Supplier position
Most frequent form: cap equal to the price (3 of 4 sales conditions), range in sales conditions 10% to 100% of the contract price.
Exclusion of consequential damages stated with the cap: 2 of 4 sales conditions. Fixed maximum amount alongside the price, whichever is lower: 1 of 4.
Elements of sales conditions besides the cap
- Reference to the price of the part giving rise to the claim instead of the total price
- Fixed maximum amount alongside the percentage, whichever is lower
- Exclusion of indirect damages and loss of profit
Further demands in purchase conditions
- Indemnity of the buyer against all claims, damages and costs without a maximum amount; only indirect damages excluded on both sides
- Liability period beyond the warranty period, counted from the last delivery of a project
- Insurance obligation beyond the end of the contract, at a level without a stated sum
Review of your own contract
Finding per clause
Cap, basis, carve-outs from the cap and exclusion of consequential damages in your own contract against the benchmark of the seller register, with quotation and clause reference.
Missing clause
A missing liability cap is reported as a separate finding with a rating.
Rating and counter-proposal
Rating per finding and counter-proposal in the language of the contract.
Amount per clause
With a contract value on record, the amount up to the cap; without a contract value, the rule without a euro amount.
Individual values with reference
Individual value, set of terms, version and clause reference are in CLEVER after sign-in, in the search under "Market reference T&Cs".
Data basis
Evaluation of published terms and conditions with a publicly available source only: purchase conditions 4, sales conditions 9. One value per set of terms and metric.
Purchase conditions read in full (as of 2026-08-28); sales conditions from search extracts (as of 2026-10-15). Range recalculated on every change to the data basis.
Inclusion of a topic from 3 sets of terms with quantified values; inclusion of the buyer or supplier side in the range from 3 sets of terms with quantified values per side.
Next step
A demonstration on a sample contract from your function, with the contract types you handle most often.
Not legal advice. CLEVER produces draft wording for internal review; your own legal or contract team decides. No legal services within the meaning of the German Legal Services Act (RDG).